JP and I drove to Fort Worth on Friday to see the house again (since we only saw it for 8 minutes the first time, while chasing after two kids who were finally starting to lose patience with their super fun "let's wake you up, throw you in the car, drive for 3 hours, and then force you in and out of car seats while we look at houses, all before lunch" Saturday) and tour a few schools and daycares. It's pretty crazy to think that we will have spent less than 10 hours in Fort Worth before moving into a house there and enrolling our children in said daycares and schools. It has been a month of very decisive decision making.
First up was the tour of our future home. I am still head over heels in love, but now that the initial passion has faded (and/or the beer goggles are off- whichever analogy you prefer), and I wasn't trying to keep Claire from jumping in the pool, I could see... flaws. Little lines and wrinkles that need some fixing up. So we had a contractor spend an hour with us, pouring every room, including two I never even walked in on our first viewing. By the end, we had a rather extensive list of projects:
Project 1: updating the horrifyingly hideous yellow and brown floor-to-ceiling tiled guest bathroom.

(it's lurking through that open doorway)
Not only is it yellow and brown tile, it is
four shades of non-matching yellow and brown tile because they ran out halfway through, and rather than scrap the god awful color combo, they persevered with different yellow and brown tiles to complete the job. The shower is also a dark cave-like structure with a shower head 4 feet off the ground. We're starting over from scratch with this one, so that one day soon it will be a lovely en suite bathroom for our beloved guests (and one of the kids, if we let them go back to separate rooms one day).
Project 2: updating the pink and blue floor-to-ceiling tiled kid/hall bathroom with peeling bathtub, 4 ft. shower head, and moldy grout. And by "updating," we mean changing out everything to be light, bright, and something you'd willingly bathe in.

Project 3: updating the master bath. The master wing of the house was added in the mid-90's, but we think they must have run out of money about halfway through. The design and basic structure are great- both our inspector and contractor complimented the architecture and core building. But the superficial stuff is cheap, ugly, and/or just odd. They used a salvaged 1960's bathtub, old fixtures, super ugly 1" beige tiles with thick grout, non-matching dark brown 1" shower tiles, and again, 4 ft. shower head height. (We met the owners, they are average height- I do not understand their showering techniques.) There is also carpet in the sink area (yuck), and despite installing a surprisingly beautiful taupe, white, and green marble counter top, they painted the walls a completely non-matching (though admittedly fetching) blue. So we're replacing the tile with new, larger tiles and thinner grout and extending it through the sink area, getting a new bathtub (I take a bath every night, the tub is a priority), painting the walls, and re-tiling the shower with lighter tiles, higher fixtures, a higher ceiling, and a glass door instead of droopy sad curtain.

Project 4: master bedroom aesthetics, including re-securing the recessed lights (they're all falling out) and removing the cheap-looking built-ins beside and behind the master bed. We have nice bedroom furniture (thank you Costco) and I want to use it. I'd also love to rip out that carpet, but that project will probably have to wait.
Project 5: removing the dated wet bar and replacing it with a nice shelved game closet.
Project 6: replacing the faux kitchen tiles with real kitchen tile and relocating the oddly placed microwave.
(can you imagine the things Clairebear would try to nuke at this height?)
The microwave is moving to a spot above the stove (there will be a vent in the bottom of the microwave- very nifty) and we're replacing the pin-point lights with wider recessed lights. The current lights are nicely placed, but they're so pin-prick concentrated that they literally blind you when you look up.
All-in-all, given that the house is about 70 years old and we poured over it for an hour with a contractor, it's in great shape. This is all cosmetic- the inspector said the foundation, systems, and core structure were all in amazing shape, so that's good. I don't know if we can afford all these projects, but we're getting an estimate for everything and will then prioritize from there. The bathrooms are definitely happening- I seriously don't see how we can shower in there, and those changes will add the greatest value to the house. It's a little intimidating to think of all the decisions to make for tile, cabinets, faucets, etc., but it's exciting too. Our current house was only 3 years old when we bought it, so even though some of the fixtures and colors weren't my favorite, it was all so new, I had no excuse to spend money changing them. Now we get to personalize everything- which means if I don't like something, it's 100% my own fault. Hmmm.
In other big decisions- we're trying to pick a daycare, neither of which are as awesome as our current one, and decide whether Landon will start Kindergarten in the fall or wait a year since he's a summer birthday. We've always assumed he'd start on time- he's super social, well-behaved, and very acclimated to the school setting, but he's a boy and he'd be one of the very youngest kids in his class and everyone seems to kind of freak out when we say we aren't holding him back. I've been quoted a lot of lines from Outliers. The daycare we're leaning towards is a Montessori school with a beautiful classroom that continues through Kindergarten. We could start him there and if he is doing great, transition him to public school for 1st grade in 2013, or start him in Kindergarten again in the public school as one of the older kids in the class. So he'd do Kindergarten twice, but in different schools with very different settings and methods of teaching, so it wouldn't feel like a repeat. I don't know. It's another $13,000 to keep him in daycare/private Kinder, but over his lifetime (and compared to the $60,000 we will have already spent on daycare), that is more of a temporary irritation than a factor in the decision (or so I keep reminding myself). I know that an extra year of aging would probably be good, no matter where he is on the academic/social scale- any older kid is likely to do better, but does that mean we should do it? even if by all standards, he's ready now? But if it helps- now or later- why wouldn't we give him the benefit of being the oldest rather than the youngest? Why not have him at home for one more year?
I actually wish you weren't allowed to start your kid late, so it was just a black and white cut-off. I don't like these kinds of parenting decisions- they affect things too far in the future. How can I know now if Landon would benefit from an extra year before heading off to high school, college, etc? So I'm pushing off that particular decision and looking at faucets and refrigerators online instead. And wading through 100 pages of federal benefits information and their 57 different health plan choices. And deciding what to buy at the store for dinner. Hmmm, and I wonder why my insomnia is back in full deadly force?
Back to faucets.